Construction Contracting

Beyazıt Tower Restoration Project

Contract date: 08.08.1996

Location: Beyazit, Istanbul – Turkey

Client: Metropolitan Municipality of Istanbul

Completion Date: 19.09.1998

Scope of Work: Turn Key Contracting

Project Details: Beyazit Tower has been built with 85 meters high in 1749 as a wooden and used as the observation tower for Istanbul Fire Department. Restoration has been started in 1997 by a well experienced construction group together with Basar Construction Contracting & Trade Limited Company. By conserving of the original form of tower, the restoration has been completed. Beyazit Tower is stil being used as an observation tower for metorology and traffic departments of the Municipality.

Restoration of Hidiv Pavillion

Contract date: 29.11.1996

Location: Beykoz, Istanbul – Turkey

Client: Metropolitan Municipality of Istanbul

Completion Date: 30.04.1997

Scope of Work: Turn Key Contracting

Project Details: Hidiv Pavilion is one of the most important historical values of Istanbul, an amazing example of the Ottoman architecture. The Hidiv Pavilion was restored by Basar Construction under the supervision of the municipality keeping the original design. The restoration was completed in 5 months with an experienced group of technicians, architectures and engineers of Basar Construction.

Yıldız Parkı Yapıları Restorasyonu

Contract date: 26.06.1995

Location: Beşiktaş, İstanbul – Turkey

Client: Metropolitan Municipality of Istanbul

Completion Date: 29.05.1996

Scope of Work: Turn Key Contracting

Project Details: In 1995, the municipality of Istanbul started a series of renovation projects in Istanbul including the historical palace and pavillions. Yildiz Park is one of the biggest green park in Istanbul having many beautiful pavillions, tents, lakes and resting areas for the public. The park was made by Ottoman Empire and hosted the top figures of the local and foreign history. The Malta Pavillion, tents and greenhouses in Yildiz Park were restored by Basar Construction after a very detailed preparation process and are still being visited by the citizens and visitors of Istanbul.

Eskişehir Göçmen Konutları
Peyzaj ve Altyapı

Contract date: 12.09.1991

Location: Eskişehir – Turkey

Client: Republic of Turkey Ministry of Government

Project Size: 10.000 m2

Completion Date: 27.07.1994

Scope of Work: Turn Key Contracting

Project Details: In coordination with the construction of the immigrant houses and the landscape, a heavy infrastructure work was held. The details are as follows;

1634 meters Sewer system Construction,

852,48 meters Wash basin supply pipe system,

2600 meters stabilized road,

400 kVa capacity Electrical power plant,

600 kVa capacity Electrical power plant,

10.000 m2 landscaping Works.

Infrastructure Works of Gorece Immigrant Houses

Contract date: 1991

Location: İzmir – Turkey

Client: Republic of Turkey Ministry of Government

Project Size: 120.000 m2

Completion Date: 1993

Scope of Work: Turn Key Contracting

Project Details: With the experience of the infrastructure construction of Eskisehir immigrant houses, the infrastructure of Gorece immigrant houses was also held by Basar Construction. The project was designed 1575 apartments with a capacity of 7500 people. The housing project was built on 120.000 m2 land.

Infrastructure Works of Akcakent

Contract date: 21.01.1991

Location: Batıkent, Ankara – Turkey

Client: S.S. Akcakent Housing Cooperative

Project Size: 20.000 m2

Completion Date: 16.11.1994

Scope of Work: Turn Key Contracting

Project Details: Infrastructure works of 49 duplex villas and 472 multi storey apartments of Akcakent Housing Cooperative were finished before landscape work. The infrastructure was designed to for 2000 people on a total of 80.000 m2 construction area.

Ayvacik Mustafa Ustundag Boarding Primary School and Carsamba Gokce Cakmak Primary School

Contract date: 02.08.2000

Location: Samsun – Turkey

Client: Republic of Turkey Ministry of National Education Investment and Facilities Department

Project Size: 14.948 m2

Completion Date: 06.12.2001

Scope of Work: Turn Key Contracting

Project Details: The project consists of two primary schools under project pack 2000E1.M4.P23 of Ministry of National Education. Following the infrastructure works, school facilities were finished in about 15 months with a total of 14.948 m2 construction area. The schools have 54 classes and a dormitory building was built for 350 boarding students nearby Mustafa Ustundag Primary School.

Adapazari Permanent Post-Earthquake Housing Project

Contract date: 17.06.2000

Location: Adapazarı – Turkey

Client: Republic of Turkey Ministry of Government

Project Size: 34.000 m2

Completion Date: 12.09.2001

Scope of Work: Turn Key Contracting

Project Details: Adapazari permanent post-earthquake residential is planned by the Ministry of Public Works and Settlement for the rapidly growing need after the big earthquake of Marmara, 1999. Infrastructure and landscaping works were finished before construction of 228 apartments in 19 blocks. The total construction area is around 34.000 m2 including the landscape elements and social facilities for more than 1000 people today.

Sivas Gokcebostan 75th Year IMKB Primary School

Contract date: 19.11.1998

Location: Sivas – Turkey

Client: Republic of Turkey Governorship of Sivas Special Provincial Administration

Project Size: 7.650 m2

Completion Date: 16.10.1999

Scope of Work: Turn Key Contracting

Project Details: For 75th year of Republic of Turkey Governorship, IMKB gave fund source for building 22 class and 48 student capacity primary school to Sivas Gokce Bostan area. Total construction area is 7.650 m2 including indoor sport facility and open playground area

Kavsut Sungurlu Sehit Kerem Beksiz Primary School and Bahcelievler Kocatepe Primary School

Contract date: 16.09.1998

Location: Corum – Turkey

Client: Republic of Turkey Ministry of National Education Investment and Facilities Department

Project Size: 12.224 m2

Completion Date: 14.07.2000

Scope of Work: Turn Key Contracting

Project Details: Sungurlu and Bahcelievler Primary Schools turnkey construction were planned under the development plan of Ministry of National Education Investment and Facilities Department and coded as 98E1.M4.P34. The construction was totally 12.224 m2 construction area. Sehit Kerem Beksiz Primary School have 12 classes on 3854 m2 having a capacity of 300 students and Kocatepe Primary School have 22 classes on 8370 m2 having a capacity of 560 students.

Multiple Social Service Buildings

Contract date: 17.10.1997

Location: Pendik ve Ikitelli, Istanbul – Turkey

Client: Republic of Turkey Ministry of Government

Project Size: 40.000 m2

Completion Date: 25.04.1999

Scope of Work: Turn Key Contracting

Project Details: As the completing elements of two biggest immigrant house projects in Istanbul located in both sides of the city, Pendik and Ikitelli, the following social service building constructions and landscape elements were built in less then 2 years by Basar Construction:

Pendik Kurtkoy Village Clinic on 1200 m2.

Pendik Kurtkoy 75. Yıl Mesut Yilmaz Primary School with 30 classes on 8400 m2 having a capacity of 900 students.

Ikitelli Village Clinic on 1200 m2.

Ikitelli Prof. Dr. Ahat Andican Primary School with 16 class on 5400 m2 having a capacity of 450 students.

Ikitelli Mosque capacity for 500 people.

Construction of Eskisehir Immigrant Houses

Contract date: 12.09.1991

Location: Eskişehir – Turkey

Client: Republic of Turkey Ministry of Government

Project Size: 30.000 m2

Completion Date: 12.07.1994

Scope of Work: Turn Key Contracting

Project Details: As a result of the big forced immigration of the Turkish people from Bulgaria in 1989, a great need of housing occurred and the Turkish Government planned a set of projects at several cities in Marmara and Aegean regions. Turnkey construction project of Eskisehir immigrant houses had 300 apartments with infrastructure elements and the landscape design on 30.000 m2 of total construction area. For this project 13.800 m3 concrete used for the infrastructure and buildings.

Akcakent Villas

Contract date: 23.08.1989

Location: Batıkent, Ankara – Turkey

Client: L.L. Akcakent Building Society

Project Size: 7.350 m2

Completion Date: 04.11.1993

Scope of Work: Turn Key Contracting

Project Details: The Akcakent Villas consist of 49 private villas, each villa is 150 m2 with two and a half floors. The project planned for high quality living style including parks, rest areas, playgrounds and social buildings on a total of 7350 m2 area.

Akcakent Housing Complex

Contract date: 24.04.1986

Location: Batıkent, Ankara – Turkey

Client: L.L. Akcakent Building Society

Project Size: 61.360 m2

Completion Date: 10.10.1994

Scope of Work: Turn Key Contracting

Project Details: Compared to the high quality living style of Akcakent Villas, Akcakent Houses Project was economically affordable option. The turnkey construction project with landscaping works had 472 apartments on a total of 61360 m2 construction area and today around 2500 people live in this very popular site in Batikent.

Construction of Additional Management Building for Elroksan A.S.

Contract date: 1998

Location: Elmadağ, Ankara – Turkey

Client: M.K.E.K. General Directorate

Project Size: 3.000 m2

Completion Date: 1999

Scope of Work: Turn Key Contracting

Project Details: M.K.E.K. is the leader organization for security and military sector in Turkey and has high quality construction standard. Upon the need of a new managerial building nearby the headquarter of the corporation, Basar Construction was elected as the contractor and the construction was finished in 12 months with a very well organized construction management team. The building has 6 floors in total 3000 m2 usable area.

Insfrastructure of Information Technology Classes

Contract date: 05.07.1999

Location: Ankara – Turkey

Client: Governorship of Ankara, National Education Department

Completion Date: 01.10.1999

Scope of Work: Turn Key Contracting

Project Details: Within the improvement plan of the Governorship of Ankara, National Education Department, information technology classes were designed and applied by Basar Construction in nine primary schools.

Fatih Student Dormitory for Ladies

Contract date: 1987

Location: Fatih, Istanbul – Turkey

Client: Istanbul General Directorate of Foundations

Project Size: 6.000 m2

Completion Date: 1988

Scope of Work: Turn Key Contracting

Project Details: The building was designed to host 500 students studying in Istanbul coming from different cities of Turkey. The building has dormitories designed for ladies as well as kitchens, bathrooms, restrooms, libraries and sport areas. Building has 6 floors with a total of 6000 m2 usable area.

CIZGI YACTH Co. Office Building

Location: Tuzla, Istanbul-Turkey

Project Date: 2010

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

Derivative – Office Building

Location: Tuzla, Istanbul-Turkey

Project Date: 2010

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

M&M Ofis Binası

Location: Kavacık İstanbul-Turkey

Project Size: 6.450 m2

Project Date: 2002

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

Metro Electronics Company Main Office & Warehouse

Location: Dudullu, Istanbul-Turkey

Project Date: 2005-2006

Scope of Work: Turn Key Contracting

Pelikan Hill Residence

Location: Istanbul-Turkey

Project Date: 2007

Scope of Work: Project & Application Management

14 Private Offices Complex

Location: Kartal, Istanbul-Turkey

Project Date: 2008

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

Aydınoglu Group Offices

Location: Kucukyali, Istanbul-Turkey

Project Date: 2008

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

GIMAS Group Office Building

Location: Ikıtelli, Istanbul – Turkey

Project Date: 2008

Scope of Work: Turn Key Contracting Project

Etiler Housing Complex

Location: Etiler, Istanbul-Turkey

Project Date: 2009

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

YONTEM Foreign Trade Co. Headquarters Office Building Extension

Location: Kavacık, Istanbul-Turkey

Project Date: 2009

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

Town Club Recreation Building

Location: Beylikduzu, Istanbul-Turkey

Project Date: 2008

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

Dragos Housing Complex

Location: Dragos, Istanbul-Turkey

Project Date: 2009

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

YONTEM Foreign Trade Co. Headquarters Office Building

Location: Kavacık, Istanbul-Turkey

Project Date: 2008

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

ENTARI Foreign Trade Building

Location: Florya, Istanbul-Turkey

Project Date: 2008

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

ISTANBUL C.C. Main Building (Chamber of Commerce) Terraces & Dining Halls

Location: Eminönü, Istanbul-Turkey

Project Date: 2009

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

M&M Group Office Building

Location: Levent, Istanbul-Turkey

Project Date: 2009

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

IMES INDUSTRIAL ZONE Headquarters Office Section

Location: Dudullu, Istanbul-Turkey

Project Date: 2010

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

Alanyalı High School

Location: Istanbul – Turkey

Client: Alanyalı Educational Foundation

Project Period: 11 Month

Scope of Work: Turn Key Construction Project

Acarkent Residences

Location: Beykoz, Istanbul-Turkey

Project Date: 2007-2008

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

Meridian Sports Center Building

Location: Erenköy, Istanbul-Turkey

Project Size: 1.930 m2

Project Date: 2003

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

Gimaş Gıda Office Building

Location: İkitelli,İstanbul-Turkey

Project Date: 2008

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

Town Clup Fıtness Center Building

Location: Beylikdüzü,İstanbul-Turkey

Project Date: 2008

Scope of Work: Architectural, Electrical & Mechanical Works Design and Erection Turn Key Contracting (Finishing Works Contractor)

LIBYA

Tajoura Rehabilitation Center Sports Building

Location: Tajoura – Libya

Client: Organization for Development  of Administrative Centers (O.D.A.C)

Project Period: 2010 – 2011 / 6 Months

Scope of Work: Design, Material Supply & Supervision of Turn Key Construction

Project Details: 2000 m2 steel construction sports building including all architectural & electromechanical items.

NIJER

25 Villas for Arab League 2007

Location: Agadez – Nijer

Project Period: 15 Days

Scope of Work: : Turn Key Construction Project