Altay Primary School

Location: Istanbul – Turkey
Client: International Lions Club
Project Period: 11 Months
Scope of Work: Project Management Consultancy
Tarman Student Dormitories

Location: Istanbul – Turkey
Client: Tarman Educational Foundation
Project Period: 11 Months
Scope of Work: Project Management Consultancy
TOKI Atakoy Residences Sales Building

Location: Atakoy, Istanbul-Turkey
Project Date 2003
Scope of Work: Architectural Design
Private Houses

Location: Silivri, Istanbul-Turkey
Project Date: 2006
Scope of Work: Architectural Design
AZERBAIJAN
400 MW Combined Cycle Power Plant – Severnaya

Location: Baku – Azerbaijan
Client: Azer Energy
Project Period: 1999 / 23 Months
Project Details: Engineering Works, Civil & Electromechanical Installation Works, 100.000 m3 excavation & backfilling, 24.000 m2 pavement works. 1.500 m2 concrete Works for pump station. Generator building turn key construction, foundations of generators.Water intake system. Pump station and water outlet system. Sewage system and breakwater construction. Railway, 370 mtons gas tribune installation, 2.100 mton detonation & electrical system. 10.000 m3 stocking tank, 5.000 m3 fuel tank.
ISR Hotel & Office Tower

Contract date: November, 1996
Location: Baku – Azerbaijan
Completion Date: August ,1998
Project Details: The project included the construction of a 22.500 sqm, eighteen storeys Apart Hotel and Office Building of turnkey basis, including execution of the basic and detail design and interior furnishing. It consisted of forty apart hotel units, 11.000 sqm offices, an a-la cart and a self service restaurant, bar, patisserie, swimming pool, fitness center and sauna.
Baku Gas Compressor Station

Location: Baku – Azerbaijan
Client: Azerigas Joint Stock Co.
Project Period: 15 Months
Project Details: Major Civil Work Items: 355 Nos of, 400 mm x 400 mm Rc Piles, 3.500 m3 of Reinforced Concrete With 350 Tons of Reinforcement And 11.000 m2 of Formwork, 275 Tons of Steel Structure, 17.000 m3 of Earth Works, 500 m3 of Asphalt Roads, Mechanical Installation. Work of nearly 600 tons (major items: compressor & blower of 200 tons, air fin cooler of 200 tons, vessel & tanks of 120 tons platform of 50 tons). Electrical (90 km of cabling) and instrumentation (500 no of indoor and outdoor instruments) installations works. Design, supply and installation of hvac system, telephone system, lighting system, steel structure erection. Supply of electrodes, paint, cables, some structural steel and architectural materials.
Schlumberger Education Center

Contract date: October, 1999
Location: Baku – Azerbaijan
Client: Schlumberger, SOSA
Completion Date: April, 2000
Scope of Work: Project Management & Constructional Logistics Management
Project Details: The project involved the design and construction of 2.000 sqm Training Centre and Office Building and 20.000 sqm landscaping and hardscaping.
BOSNIA HERZEGOVINIA
Renovation of Dobrinja Hospital
Location: Bosnia Herzegovinia
Client: Ministry of Foreign Relations & Economics
Project Period: 2002 – 10 Months
Scope of Work: Project Management & Constructional Logistics Management
Project Details: The Project consisted of repair,rehabilitation and reconstruction of the heavily damaged 12 apartment blocks(360 units) and slightly damaged 20 apartment blocks (450 units), infrastructure and landscaping in Dobrinja,Sarajevo.Rehabilitation of residence building,special hospital building and reconstruction of the central heating building of the Medical Center in Fojnica.
LIBYA
Cathodic Protection of Great Man-Made Rive

Location: Sirte / Libya
Client: GMMRA
Project Period: 11 Months
Project Details: Drilling of 50.826 nos 8.9 m holes, installation of zinc anodes and placing of chemical black fill, laying of 539,484 m header cable, including opening of 1.5 wide, 1.5 m deep trench, laying sand bedding, laying the cable, laying the sand cover, and black filling the rest with the existing material and compaction, connecting the anodes to the header cable and encapsulating them, installation of 930 nos control boxes and their stud welding works, installation of cathodic protection system against corrosion of the 4m diameter prestressed concrete pipe line conveying drinkable water from Libyan desert to seashore.
Al Baida Omar Mukhtar University

Location: Al Baida – Libya
Client: Organization for Development of Administrative Centers (ODAC)
Scope of Work: The necessary works to be done for the completion are:
– Surveying the already existing structure and finding and repairing any damaged structures,
– Completion of the unfinished concrete work,
– Installation of all electrical systems,
– Installation of all mechanical systems (Hvac, plumbing, sanitation and sewage systems),
– Execution of all interior finishing works of the two buildings. (Doors, windows, plaster, paint, marble, stair covers floor tiles)
– Execution of all exterior finishing works of the two buildings. (paint, stone, roof tiles.)
– Landscaping.
Project Details: The project consists of completing the construction work of two buildings for Omer Mukhtar University, which are located inside the university campus in the city of Al Baida. Each of the buildings is approximately 12.500 square meters.
Gharian Central Hospital
Location: Gharian – Libya
Client: Secretarial of Health West Mountain Branch
Project Period: 11 Months
Scope of Work: Project Management & Constructional Logistics Management